Workspace

Publishing operations
Sync healthy
3 approvals pending
2
Approval waitingSummer homepage launch is still open.
Media queue7 assets are waiting on crops or alt text.
EC

Page editor

Homepage refresh

Structured homepage drafting for a live release. The state below shows what an editor would see before the refresh moves into review and publish.

Revision signals

Current draft status

Last edited18 minutes ago
Revisionv24
Authoring stateDraft locked
Homepage slotReserved

Revision trail

Latest changes in the draft

  1. Replaced manual story cards with the live post feed.
  2. Updated the secondary CTA to point at the current volunteer program.
  3. Pinned the alert banner to the shared global notice.
  4. Confirmed the bilingual headline pair for both visible locales.

Live signal

Live

Preview sync

Public preview matches the current draft

Live signal

Queued

Review state

Waiting on translation QA before publish

Live signal

Reserved

Homepage slot

Launch window held for tomorrow morning

Content modules

Configured blocks on this homepage draft.

Hero

Headline, impact stat trio, CTA, and locale-aware media slot

Story strip

Three featured stories linked from the live post queue

Upcoming events

Carousel powered by the structured event feed

Alert banner

Global notice pinned above the navigation area

Publish checklist

What still needs confirmation before launch

  • Primary locale copy approved and locked
  • Secondary locale heading waiting on final polish
  • Hero image crop confirmed for mobile and desktop
  • SEO title, description, and social preview set
  • Homepage carousel slot reserved for launch

Workflow notes

How this page moves through the workflow

  • Preview links are sent before publish so layout issues surface early.
  • Block order stays reusable while copy and media remain locale-specific.
  • Shared alert banners can be toggled without reopening the draft.
  • Publish windows stay visible so the homepage can land with the rest of the release.

Revision summary

Latest draft activity

  1. Hero impact stats aligned with the current campaign period.
  2. Upcoming events module switched from manual cards to the live feed.
  3. Secondary CTA updated to support the onboarding path.
  4. Alert banner remains attached to the shared network notice.

Approval rail

Review cues for the final publish pass

Content designApproved
Translation QAIn progress
SEO reviewDrafted
Publish windowTomorrow 08:00 UTC